Well now the house is sheet rocked and all indoor units are installed. Line sets are ran,along with all wiring. Distribution boxes are in place and the job is starting to shape up. No outdoor units are installed yet due to weather and construction schedule. This house will have (2) LMU540HV outdoor units along with one single zone unit( LUU246HV) for mast bedroom. Units in this house are (LMCN125HV,LMCN185HV,LMAN095HVT, LCN246HV)
 OUTSIDE OF HOUSE
 MAIN KITCHEN AND FAMILY ROOM (3) 12,000BTU CEILING UNITS
 DIS BOX (1) FOR 1ST FLOOR
 ALL CONDISATE WILL DRAIN INTO A SINK AND WILL BE LABLED IN BASEMENT
 BEDROOM (1) 12,000 BTU UNIT
 SECOND FLOOR DIS BOX
 BEDROOM (2) 12,000 BTU UNIT
 MASTER BEDROOM 24,000 BTU UNIT
 BASEMENT WALL HUNG LOCATION 9,000 BTU
BEDROOM (3) 12,000 BTU UNIT